Many people are afraid of cross-year decoration. In fact, as long as they are properly handled, there are many benefits for the cross-year renovation. Because the five major parts of the renovation project : program design, water circuit transformation, tile paving, furniture production and post-installation, are not affected by seasonal factors. In winter, the interior is dry and the temperature is suitable for decoration. There is less possibility of problems than the construction in spring and summer. In addition, the end of the year is approaching, all material dealers in order to rush to the task, often take the strategy of the sales of stickers, in order to fight for manufacturers to rebate, consumers can get more benefits; off-season decoration, there is more room to choose the master, usually a rare idle master This time is also relatively free, the master does not work, the slow work can be fine work; the renovated room after a winter ventilation, is conducive to the volatilization of harmful substances, can stay or rent in the spring.
Teach you 12 winter functional processes
I. Hydropower stage
1. In order to prevent the hose from cracking due to the low temperature at night, we use the plug to plug the outlet before it is completed. It is forbidden to use a hose to connect hot and cold water pipes.
2. In order to prevent the freezing of the water pipes caused by the freezing of water in the water pipes, we must turn off the main valve every day after work to empty the water in the pipes to prevent the remaining water in the pipes from freezing and causing the pipes to freeze;
3. When the electrician installs the switch panel, the fixing screws should not be tightened too tightly, and there must be some room for contraction to prevent the panel from breaking after the expansion.
Second, the woodworking stage
4, in order to prevent the moldy board, we in the back of the veneer book again varnish seal plate pores, thereby inhibiting the white latex water evaporation to the plate;
5, in order to allow the glue to fully dry to prevent the cabinet door from deforming, we have stipulated that the pressing time of the door should be extended for another 3 days on the basis of the suppression of the original 7 days in the summer, and the doors should be turned over and pressed every day after 3 days. Because the long pressing time does not ventilate the door and cause mold;
6, in order to prevent the lines from shrinking and deforming, the carpenter is not allowed to plan the lines and veneer in the construction, so that the paint is closed after the arrival of the plane and sealed with paint to prevent deformation of the lines.
Third, the mason stage
7, in order to prevent the tiles emptying, falling off, we set the tiles to move from the outdoors to the room for 24 hours to adapt to the indoor temperature before paving;
8, in order to prevent the moisture in the cement caused by the freezing of the tiles, when the temperature is below 0 °C, the construction site is prohibited;
9. During masonry wall construction, light bricks are immersed in humidity controlled at 50% humidity, which is beneficial to the firmness of the wall structure. After painting is basically done, we use electric hammers to promote the wall with a little perforation on the wall. Water is dry and fast;
10. We reserve a gap of 1MM when we apply seamless bricks to prevent the collapse of the wall brick after expansion.
Fourth, the paint stage
11, for latex paint, paint film can be normal to prevent paint off, paint powder, the temperature is lower than 5 °C when the construction site is prohibited, 5 °C above 10 °C, the need for iodine tungsten lamp for temperature treatment;
12, paint can not be thick spray, only thin spray more times.
Knowledge of building materials Three trees paint interior decoration paint interior decoration latex paint switch decoration design door tile adhesive
Basically there are two types of Diameter Tape Measure, one is Pipe OD Tape Measure Diameter Circumference, another is ID (Inner Diameter) PP Tape Measure
Pipe OD Tape Measure Diameter Circumference
Product Description:
The 2-meter Pipe OD Tape Measure Diameter Circumference is made of reliable material to satisfy precise diameter measuring requirement.The reading for the perimeter, accurate to 1 mm. The tape is double sided with circumference (measures in cm & inch) and diameter (measures in inch & inch) on the either part. Pipe od tape measure adopts fiberglass tape to deliver water and stain proof effect and to ensure that it is of good elasticity for diameter measuring. The retracting mechanism is built in the durable ABS case, thus service life is extended. Wintape provides the diameter tape measure with other patterns and offers customized logo for you.
ID (Inner Diameter) PP Tape Measure
Product Description:
Inner diameter tape measure is made of PP material that is of excellent stress tensile strength and high elasticity. The scale numbers are already been calculated so the tape gives you the result directly without calculating. The practical ID measuring tape can be adopted in various ways such as pipe and container measuring. The double sided inner diameter measuring tape makes number reading easier and more convenient.
64 Pi Tape Measure,Diameter Plastic Measuring Instrument,Diameter Plastic Measurement Tools
Wintape Measuring Tape Company , https://www.wintapetapemeasure.com