For the novice renovation, the renovation steps are a common concern. Therefore, Nantong Home Network Xiaobian has arranged the process steps for house decoration, and hopes to help you.
Step 1. Pre-design: It is mainly designed according to your own living habits, and a detailed measurement of your room. Don't be lazy. It is best to measure it yourself. The contents of the measurement mainly include: the area involved in the decoration process. In particular, the tile area, wall paint area, wallpaper area, floor area; clear main wall size. In particular, it is necessary to design the wall size of the furniture in the future.
Step 2: Main body demolition: Entering the construction stage, the main body demolition is the first project, mainly including demolition, wall building, shovel wall peeling, demolition of heating, plastic steel windows and so on. The main body of the demolition is white, that is, the framework of the construction site is first put together.
Step 3: Hydropower transformation: Before the water circuit transformation, the main structure demolition should be basically completed. Between the two aspects of hydropower transformation and main body demolition, some students may know that the first measurement of the cabinet should also be carried out. In fact, the so-called cabinet first measurement has no actual content, because the wall and the ground are not treated, the cabinet designer can not give the specific design size, but only the developer's reserved water inlet, hood socket Location, make some relevant suggestions. Mainly include: see if the position of the hood socket affects the installation of the hood later; see if the position of the water meter is suitable; see if the position of the water inlet is convenient for installing the sink later. For the first measurement of the cabinet, a slightly experienced student can do it himself. After the completion of the waterway reconstruction, it is best to do the waterproofing of the bathroom. The kitchen generally does not need to be waterproof.
Step 4: Woodworking: Woodworkers, bricklayers, and oilers are the “three brothers†in the construction process. The basic order of appearance is: wood – tile – oil. The basic principle of appearance is - who is dirty and who is first. "Whoever gets dirty first" is also one of the basic principles that determine the order of home improvement, which I will mention later. In fact, the woodworking activities such as the package riser, the decorative ceiling, and the plaster line can also be considered as a detailed link of the main body demolition. It does not conflict with the water circuit transformation. Sometimes it needs some Cooperate.
Step 5: tiling: In the process of “Washer Buddy†operation, it also involves the installation of the following three links: the installation of the door stone and the marble window sill. The installation of the stone can be done with the paving slabs. After the paving slabs, the installation of the marble sills is usually done after the window sills are completed. The marble-mounted workers prepare the glass glue and seal the marble and window coverings with glass glue. It is. Installation of floor drains. The floor drain is the first in the home improvement hardware because it is to be installed together with the floor tiles. Therefore, when students start building materials, they should buy floor drains early. The installation of the hood. The range hood is the first to appear in the home appliance. After the kitchen wall and floor tiles are laid, you can consider installing the range hood. The "Watt Worker's second child" leaves the scene. At this time, the cabinet can be measured for the second time. To be precise, after the kitchen wall tiles are installed and the hood is installed, the cabinet can be measured for the second time.
Step 6. Brush the wall finish: “Oil workers third†entered the market, mainly finishing the wall surface treatment, brushing the topcoat, and painting the furniture for the “carpentry bossâ€. Students who are ready to paste wallpapers only need to let the "oiler's third child" do the grassroots treatment on the wall of the wallpaper. As for whether or not to leave the last coat, I personally feel that this problem is not necessarily too true. From the experience of my decoration, the significance of leaving a top coat is not very big, because the latter operation is no more dirty than painting. .
Step 7. Kitchen and bathroom ceiling: The cabinet ceiling is the first step in the installation process, and it is still continuing the “packaging†of the home. At the same time as the kitchen and bathroom ceiling, the kitchen's moisture-proof ceiling lamps and exhaust fans (Yuba) should have been bought. It is best for students to install the kitchen ceiling lamp and exhaust fan (Yuba) at the same time, or leave the thread and opening.
Step 8. Installation of the kitchen cabinet: After the ceiling is finished, it can be installed on the door of the cabinet. If you are successful, you can finish the day. At the same time, there are also sinks (may not include upper and lower water parts) and gas stoves. Before installing the cabinets, it is best to coordinate the property to pass the gas, because the gas stove needs to be tested after it is installed.
Step 9. Installation of wooden door: On the second day of installation of the cabinet, as soon as the measurement of the wooden door is completed more than one month ago, it can be installed. If it is smooth, it is also the time of day, the hinge, the door lock and the ground suction to be installed at the same time. Students should prepare relevant hardware in advance. If you want the wooden door manufacturer to install the window cover and the cornice, it should be measured together when the wooden door manufacturer measures it, and installed at the same time on the day of the wooden door installation. At the same time, the installation time of the marble window sill should be considered to be wrong, and it is arranged in the window cover. After installation. Remarks: The production cycle of wooden doors is generally one month. Therefore, in order to make the construction period close, it is necessary to let the wooden door manufacturers come to the door to measure the size of the door as soon as possible after the main body is dismantled. Regarding the handling of the door opening, everyone needs to pay attention to it. If the height of the door opening in the house is inconsistent, the worker needs to be processed into a contour - good-looking.
Step 10: Floor installation: The floor can be installed on the second day of the installation of the wooden door. If it is smooth, it is also a day. Floor installation needs to pay attention to the following problems: 1. Before installing the floor, it is best to let the factory go to the door to investigate whether the ground needs to be leveled or partially leveled. Some decoration companies or renovation teams will recommend the students to level or partially level the floor, to the floor manufacturers. The actual survey shall prevail; 2. Before the floor is installed, the floor of the pavement floor of the home shall be cleaned to ensure the dryness of the ground, so do not use water during the cleaning process. 3, when the floor is installed, if there are conditions, the cutting of the floor must be in the corridor. Previous forums have also discussed this issue. Some students think that it is unethical to cut the floor to pollute public areas in the corridor. My idea is to clean up after finishing, not to tighten. The indoor floor cutting is more serious on the wall. Similarly, there is the cutting of the artificial stone countertops in the cabinet. I believe that the renovated students have some experience.
Step 11, paving the wallpaper: On the second day of the floor installation, the house is cleaned up, you can put it on the wallpaper, and if it is smooth, it is also the time of day. If there are conditions, the floor should be protected on the day of wallpapering; it doesn't matter if there is no condition. It is no problem to hand over the wallpaper glue left on the floor to the pioneering cleaning. Before laying the wallpaper, try to do "do not have anything" on the wall.
Step 12: Radiator installation: On the second day after the wallpaper is laid, the students who replace the radiator or dismantle the radiator can hang the radiator on the wall. The same is the time of day. Wooden door - floor - wallpaper - radiator, this is a generally accepted correct installation sequence, the first to install the wooden door is to ensure that the baseboard of the floor can be closely engaged with the door cover of the wooden door; the back of the wallpaper is mainly because of the floor The installation is dirty, dusty, and the wallpaper is seriously polluted. Here again I use the principle of "Who is dirty first?" Finally, the radiator was installed because only the wall wallpaper was laid to install the radiator.
Step 13, switch socket installation: students should have a detailed understanding or record of the number and location of the switch sockets in the natural room, especially for the students who paste the wallpaper, sometimes the wallpaper workers are irresponsible, the wallpaper is called The sub-shop, he does not use the wallpaper knife to open the hole in the position of your switch socket. Therefore, it is still necessary for the students to know what they are.
Step 14, the installation of the lamp: the lamp is installed, nothing to say. After the lights were installed, the house lit up and bid farewell to the glare of the 100-watt incandescent bulb during the renovation - it felt good.
Step 15. Hardware ware installation: The upper and lower water pipes, bathroom accessories, toilets, drying racks, etc., which were bought before, are all installed. After the "big things" were installed, the home was still very cold. When the lamps and hardware were installed, the family was "live" and really "lived". It is not an exaggeration to say that the first time you open Longshui to watch the water "å“—, å“—" go out, the heart will be very beautiful; the first time at home, the newly installed toilet will be very fulfilling, right, I also gave it a good name - "Virgo."
Step 16. Curtain rod installation: The installation of the curtain rod marks the basic end of the home decoration.
Step 17, pioneer cleaning: Before the pioneering cleaning, do not install curtains, remember that the "interpretation curtains" in the post reminded everyone. When pioneering cleaning, do not have furniture and unnecessary household appliances at home, try to maintain more "flat", so that the pioneering cleaning can be thoroughly cleaned.
Step 18: Furniture entering the market: Regarding the purchase time of furniture, my suggestion is that the water circuit must be reconstructed at the earliest, so that we can choose the basic size range of furniture. Therefore, some students have been eager to order furniture before the renovation has begun. Personal feeling is not necessary.
Step 19, home appliances come into the scene: At this time, the home appliance should enter the market, the installation of the installation, ready to stay!
Step 20, home accessories: home accessories, the final step of home improvement, and has been changed from decoration to decoration, including the installation of curtains are part of the home accessories. As for buying curtains, it is best to order furniture to avoid style conflicts. Home accessories also include the possibility to buy some green plants, wall paintings, display crafts, etc. In short, after you stay, you are free to play.
Nantong GO Jiaju article recommended
Decoration newcomer welfare home improvement wall acceptance strategy
Simple but not simple small-sized home improvement case
Art and art home decoration: put the autumn beauty into the home
66 flat pink blue apartment is also wonderful
130 flat three-bedroom Macaron color home decoration case
Thin wall ball bearings are simple in structure and easy to use. Mainly used to bear radial load, but when the radial clearance of the bearing is increased, it has a certain performance of Angular Contact Ball Bearing and can bear combined radial and axial load.
When the speed is high and thrust ball bearings are not suitable, thin wall ball bearings can also be used to bear pure axial loads. Compared with other types of bearings of the same size, this type of bearing has a small friction coefficient and a high limit speed. But it is not impact resistant and not suitable for heavy loads.
Thin wall ball bearings have a bearing inner diameter and outer diameter ratio less than a specified value. The ratio of bearing outer diameter to bearing inner diameter is 1.25 or less. It is called thin wall ball bearings, which means that the outer diameter-inner diameter value of the bearing is very small and the bearing wall is very thin.
The precision required by thin wall ball bearings is very high, because the wall is very thin, so the weight it can carry is also very low, and the impact resistance is very poor, so this must be selected according to the use environment!
Characteristics
The specific use of thin wall ball bearings:
Model airplanes, remote control cars, machine tools, motors, water pumps, agricultural machinery, textile machinery, laser printers, instruments, measuring instruments, electronic accessories, motors, motors, etc.
Welcome to contact me to get the price of thin wall ball bearings!
Thin Wall Ball Bearing,Thin Section Bearings,Thin Ball Bearing,Thin Wall Bearing
Shijiazhuang Longshu Mechanical & Electrical Equipment Trading Co., Ltd. , https://www.longsbearing.com