What is the car price, ship price, pit price and bank dual control

1, car plate price: that is, the train has been loaded with coal, will be issued before all but the train freight costs. It includes coal pit prices, taxes and fees (also known as exit fees), car freight, a number of taxes and fees on train stations, and railway planning fees (also known as point charges).
2. Shipboard price: It means that the ship has already loaded coal, and it will issue all costs except for the ship's freight. It includes coal pit prices, taxes and fees (also known as exit fees), car freight, and a number of taxes and fees on ship terminals.

3, pit price: refers to the price of transactions in Hangkou, generally does not include any costs incurred in addition to coal prices (such as mountain suit train fees are paid, station fees, loading fees, borrower fees, ** and Sent to those who stopped the Li ghost's benefits fee).

4. Bank dual control: It is a payment method of the bank and is jointly controlled by both parties. This is to ensure that both parties need to pay for a contract.

Spanish Type Resin Roof Tile

Spanish Type Resin Roof Tile,Spanish Roof Tile,Synthetic Terracotta Roof Tile,Duramit Pvc Plastic Roof Tile

ZHENHAO BUILDING MATERIALS CO.,LTD , https://www.zhpvctile.com