Plastic runway floor maintenance

The plastic runway is beautiful and durable. If it can be maintained regularly, its service life will be greatly extended. Daily maintenance should pay attention to the following points:
1. After the plastic runway is laid, it will take 7-10 days for maintenance.
2. The plastic runway is suitable for all-weather use, provided that it has certain drainage facilities. The plastic track is used for athlete training, competitions, and student sports and fitness exercises and is not suitable for other purposes;

3, to avoid the pollution of harmful substances, often kept clean, to avoid severe mechanical shock and friction, the vehicle is not allowed to run on the runway, stacking heavy objects and sharp objects (except for standard running shoes). Athletes must wear specialized sports shoes. The length of nails should not exceed 7 mm. Jumping shoes should not exceed 11 mm. If sports shoes have longer nails, they must not be used on plastic track. ;
4, avoid long-term load;
5. Avoid pyrotechnics and isolate heat sources and avoid contact with organic solvents, chemicals, cigarette butts, other fires, and pollutants.
6, should be sprayed with water spray cleaning, a small amount of residual water after cleaning can be removed with a dry cloth. Dirty with 10% ammonia or detergent, detergent scrub.
7. The edges of the plastic runway should be protected and shall not be tilted freely. If any damage or blistering of the road is found, the construction unit shall be promptly notified of the repair.