Sticker 1. Make the wall rougher and better before tiling, which can increase the contact area of ​​cement and wall. The specific method is to use the electric drill to drill more holes on the wall, the more the better. Some decoration companies now call this a hairy hair. I have not seen any specific practices, but my bricklayer later told me that the practice is not to deal with the wall, but to roll the glue on the wall first, then the cement. On the wall, after the cement solidifies, it is like a wall in the theater. It is then pitted and then tiled on it. In fact, this does not increase the contact area between the cement and the real wall. The contribution is not great, so I think that the idea of ​​pulling hair is actually a bit of a fool.
Sticker 2, tiling must require the bricklayer to pull the wire, and supplemented by the level ruler, no matter how good the bricklayer's self-blowing skills, how good it is, I suggest you still insist on using tools to control the quality.
Sticker 3, general load-bearing wall surface with cement mortar can be, but the kitchen flue, bathroom air duct, kitchen and toilet when the wall of the pipe is tiling, must add 108 glue to the cement mortar to increase the adhesion.
Sticker 4. When the decoration company tiling, the tile union holds a ruler made of a large core board to allow you to check and accept. In fact, the thing is not polished to a certain number of times, so you can not take that to check the stickers. The quality of bricks must be checked with a ruler or aluminum alloy.
Sticking 5, preventing empty drums, checking the tiles and empty drums can not just knock them out, it is best to wait for two or three hours to knock, especially pay attention to the four corners of the tiles. I suggest that you have to knock one by one. If you hear the empty drums, you must rework. Don't be soft, because if you want to make it up, you will know the danger of empty drums when you finally install things on the tiles. If you break a corner with a dozen of tiles, you will cry without tears.
Note 6: The floor of the bathroom must be sloped to the ground, and the slope should be appropriately increased. The pipe in the bathroom should be modified to avoid changing the original drainage and sewage pipes and floor drains to avoid leakage caused by damage to the waterproof layer caused by re-discharging the floor. .
Sticker 7: Tile coloring agent with color powder with color, it is best to debug a little look first, then determine the amount, otherwise it is not too shallow or too deep.
Sticker 8: The slope of the bathroom decoration floor should be considered before paving the brick. The slope according to the national standard can not achieve the effect of rapid drainage, and if you use deodorant floor drain or ultra-thin floor drain, the drainage difficulty will be greatly aggravated.
Sticker 9: Don't spread ordinary tiles because the laundry is not very important. Be sure to lay them out. Cheap tiles, it is easy to absorb water, there will be chromatic aberration.
Concerned about surprises
Label: tiling notes for bathroom decoration
Previous: Introduction of the characteristics of planetary roller screw Next: Test machine failure check and elimination
Y Strainer,Y Strainer Valve,Flanged Y Strainer,Stainless Steel Y Strainer
Wenzhou Dico Valve Technology Co.,Ltd. , https://www.dicovalves.com