Renovation is always a small sum of money. Before decorating, would you like to know what kind of expenditures are needed for renovation? How much does it cost to decorate every place? How to rationally plan the decoration costs? First, there must be a detailed renovation plan and a clear home decoration budget . For the friend who first renovated, how to book this fee is impossible. Below, Xiao Bian gave you an ordinary family decoration budget for your reference.
Ordinary family decoration budget table: direct cost + ( direct cost X comprehensive coefficient) = total cost
Direct costs include: materials, equipment accessories, freight and labor costs. The freight rate in the city is generally 1.5%, and the labor cost is generally 30 to 50 yuan for 1 working day. The comprehensive coefficient includes: profit, various construction charges, taxation fees, generally about 20%. The tax is about 3.8%, and the management fee is about 7-10%. If the direct cost is 20,000 yuan and the comprehensive coefficient is 20%, then the total cost = 20,000 + (20,000X20%) = 24,000 yuan.
The above calculation methods belong to the "transparent quotation" commonly used by large companies, that is, the unit price of each material does not exceed the market guidance price. This is very important for those who demand high-end decoration. If the total cost of decoration of 500,000 yuan, a difference of 1-2% is the spread of 10,000 yuan. However, the general decoration company adopts a relatively simple method, that is, total cost = material fee + labor fee.
Ordinary family decoration budget table: the total sum of the cost of the single project contracting package cost = total cost
If the cost of artificial materials for latex paint is 15 yuan per square meter and the area to be painted is 150 square meters, the single project price for the wall project will be equal to 2,250 yuan, and the individual cost of each project will be calculated one by one. And then sum, the sum is the total cost.
If the user supplies materials or equipment by himself, the corresponding materials or equipment shall be deducted. Estimated cost of home decoration, the general use of package materials more methods, special decoration prices are negotiable. After the price has been negotiated by both parties, it is possible to sign a decoration contract. In the contract, it is necessary to indicate that the total cost will be packaged once. If there is a change, another increase or decrease will be made.
In general, the total cost of decorating should be 10% to 20% of the house price. At present, people are pursuing comfort-oriented, and the distribution ratio of material costs is reasonable: toilets and kitchens account for 45%, halls account for 35%, and bedrooms account for 20%. The cost is 100 to 500 yuan/square meter for the low-grade decoration, 500 to 1000 yuan/square meter for the mid-range decoration, 1000 to 1,500 yuan/square meter for the middle-grade decoration, and 1500 to 2,000 yuan/square meter for the high-grade decoration , 2000 yuan / square meters for the super high-end decoration. You can click here to locate the decoration standards and estimate the required fees.
2018 General Home Improvement Budget Reference
name | Quantity of work | unit price | Amount | Note |
(square meters) | (yuan) | (yuan) | ||
living room | ||||
Top latex paint | twenty two | 12 | 264 | |
Living room ceiling | 9 | 130 | 1170 | |
Top molding ceiling | 30.04 | 95 | 2853.8 | |
Wall base treatment | twenty one | 16 | 336 | |
Wall paint | 65 | 26 | 1690 | |
Wall Wallpaper | 4.56 | 10 | 45.6 | |
TV backdrop | 1 item | 1800 | 1800 | |
Shoebox | 1 item | 1500 | 1500 | |
Balcony backfill slag | 3 party | 150 | 450 | |
Balcony tiles | 9.5 | 120 | 1140 | |
restaurant | ||||
Top latex paint | Square meter | 7.7 | 12 | |
Top ceiling | 21.64 | 95 | 2055.8 | |
Top floor treatment | 7.7 | 16 | 123.2 | |
Wall base treatment | 15.24 | 16 | 2433.83 | |
Wall paint | 15.24 | 12 | 182.88 | |
Wine cabinet | 12.51 | 260 | 3252.6 | |
Heating cover | 1 top | 300 | 300 | |
kitchen | ||||
Suspended ceiling | Square meter | 7.04 | 170 | |
Wall paint | Square meter | 23.92 | 12 | |
Wall base treatment | Square meter | 23.92 | 16 | |
Wall tiles | 30 | 110 | 3300 | |
Aluminum buckle ceiling | 5 | 120 | 480 | |
Aluminum titanium alloy door | 1 fan | 480 | 480 | |
Gate Stone | 1 item | 80 | 80 | |
Cabinet cabinet | 2.8 meters | 1,000 | 2800 | |
Hanging cabinet | 1.6 meters | 500 | 800 | |
Wash basin and high bend faucet | 1 set | 360 | 360 | |
Range hood | 1 set | 1200 | 1200 | |
Stove plate | 1 set | 420 | 420 | |
Ceiling light | 2ç› | 50 | 100 | |
Water heater | 1 set | 1,000 | 1,000 | |
master bedroom | ||||
Top floor treatment | 13.4 | 16 | 214.4 | |
Top latex paint | 13.4 | 12 | 160.8 | |
Wall paint | 12.4 | 12 | 148.8 | |
Wall base treatment | 23.6 | 16 | 377.6 | |
Wall Wallpaper | 11.2 | 10 | 112 | |
Finished door and door cover | 1樘 | 980 | 980 | |
Entrance ceiling | 1.36 | 160 | 217.6 | |
Doorless wardrobe | 4.32 | 480 | 2073.6 | |
Hanging cabinet | 2.6 | 580 | 1508 | |
Plaster line | 14.08 | 14 | 197.12 | |
Bedside background | 1 item | 400 | 400 | |
Window stone | 1.6 meters | 220 | 352 | |
Laminate flooring | 14 | 100 | 1400 | |
European chandelier | 1ç› | 600 | 600 | |
Second bedroom | ||||
Doorless wardrobe | 3.98 | 480 | 1910.4 | |
Hanging cabinet | 2.7 | 580 | 1566 | |
Wall base treatment | 28.5 | 16 | 456 | |
Wall paint | 28.5 | 12 | 342 | |
Top floor treatment | 9.7 | 16 | 155.2 | |
Top latex paint | 9.7 | 12 | 116.4 | |
Top corner line | 15.48 meters | 14 | 216.72 | |
Window stone | 1.5 m | 120 | 180 | |
Finished door and door cover | 1樘 | 980 | 980 | |
Laminate flooring | 9.5 | 100 | 950 | |
European chandelier | 1ç› | 600 | 600 | |
bathroom | ||||
Dumb mouth cover | 6.2 | 170 | 1054 | |
Bathroom ceiling | 2.12 | 170 | 360.4 | |
Wall tiles | twenty one | 110 | 2310 | |
Package water pipe | 1 | 150 | 150 | |
Aluminum buckle ceiling | 3 square meters | 120 | 360 | |
Aluminum titanium alloy door | 1 fan | 480 | 480 | |
Gate Stone | 1 item | 80 | 80 | |
Toilet | 1 set | 480 | 480 | |
Shower Umbrella | 1 set | 680 | 680 | |
Towel racks and trays | 1 set | 60 | 60 | |
Yuba | 1 set | 360 | 360 | |
Washing machine faucet | 1 | 20 | 20 | |
Aisle beam shaping | 1 | 100 | 100 | |
11 working balcony security net | 160 yuan | |||
aisle | ||||
Suspended ceiling | 10.92 | 160 | 1747.2 | |
Latex paint | 12.1 | 12 | 145.2 | |
Top floor treatment | 8.7 | 16 | 139.2 | |
Wall base treatment | 15.59 | 16 | 259.44 | |
other | ||||
Water, circuit reconstruction | item | 1 | 1, Waterway: Ming walk PPR pipe 65 yuan / meter; dark walk (brick wall) PPR pipe 75 yuan / meter (concrete wall) PPR pipe 80 yuan / meter; move PVC drain 65 yuan / meter; without faucet, valve . | |
Sanitary ware installation fee | 2, circuit; | |||
Lighting installation fee | item | 1 | 350 | (1) Ming Guan: A Strong 18/meter; B Weak (TV, telephone, network 20 yuan/meter; audio line 25 yuan/meter) |
High-altitude operation fee | item | 1 | 0 | (2) Dark pipe: On this basis, add (brick wall) 8 yuan/meter, concrete wall 12 yuan/meter. |
Rubbish clearance freight | item | 1 | 300 | Transportation from the construction site to the designated location of the residential property (one room below 80 square meters to receive 150 yuan; two-bedroom 80-120 square meters to receive 260 yuan, three-bedroom 120-150 square meters to receive 300 yuan; four-bedroom 350 yuan; villa 450 yuan). |
8% project management fee | item | 1 | 0 | Eight percent of project cost |
2% material transportation fee | item | 1 | 0 | 2% of project cost |
2% material loss fee | item | 1 | 0 | 2% of project cost |
3% remote construction | item | 1 | 0 | 3% of project cost |
3% engineering design fee | item | 1 | 0 | 3% of project cost |
Building slag removal | 240 yuan | |||
Material handling | 240 yuan |
name | Quantity of work | unit price | Amount | Note |
(square meters) | (yuan) | (yuan) | ||
living room | ||||
Top latex paint | twenty two | 12 | 264 | |
Living room ceiling | 9 | 130 | 1170 | |
Top molding ceiling | 30.04 | 95 | 2853.8 | |
Wall base treatment | twenty one | 16 | 336 | |
Wall paint | 65 | 26 | 1690 | |
Wall Wallpaper | 4.56 | 10 | 45.6 | |
TV backdrop | 1 item | 1800 | 1800 | |
Shoebox | 1 item | 1500 | 1500 | |
Balcony backfill slag | 3 party | 150 | 450 | |
Balcony tiles | 9.5 | 120 | 1140 | |
restaurant | ||||
Top latex paint | Square meter | 7.7 | 12 | |
Top ceiling | 21.64 | 95 | 2055.8 | |
Top floor treatment | 7.7 | 16 | 123.2 | |
Wall base treatment | 15.24 | 16 | 2433.83 | |
Wall paint | 15.24 | 12 | 182.88 | |
Wine cabinet | 12.51 | 260 | 3252.6 | |
Heating cover | 1 top | 300 | 300 | |
kitchen | ||||
Suspended ceiling | Square meter | 7.04 | 170 | |
Wall paint | Square meter | 23.92 | 12 | |
Wall base treatment | Square meter | 23.92 | 16 | |
Wall tiles | 30 | 110 | 3300 | |
Aluminum buckle ceiling | 5 | 120 | 480 | |
Aluminum titanium alloy door | 1 fan | 480 | 480 | |
Gate Stone | 1 item | 80 | 80 | |
Cabinet cabinet | 2.8 meters | 1,000 | 2800 | |
Hanging cabinet | 1.6 meters | 500 | 800 | |
Wash basin and high bend faucet | 1 set | 360 | 360 | |
Range hood | 1 set | 1200 | 1200 | |
Stove plate | 1 set | 420 | 420 | |
Ceiling light | 2ç› | 50 | 100 | |
Water heater | 1 set | 1,000 | 1,000 | |
master bedroom | ||||
Top floor treatment | 13.4 | 16 | 214.4 | |
Top latex paint | 13.4 | 12 | 160.8 | |
Wall paint | 12.4 | 12 | 148.8 | |
Wall base treatment | 23.6 | 16 | 377.6 | |
Wall Wallpaper | 11.2 | 10 | 112 | |
Finished door and door cover | 1樘 | 980 | 980 | |
Entrance ceiling | 1.36 | 160 | 217.6 | |
Doorless wardrobe | 4.32 | 480 | 2073.6 | |
Hanging cabinet | 2.6 | 580 | 1508 | |
Plaster line | 14.08 | 14 | 197.12 | |
Bedside background | 1 item | 400 | 400 | |
Window stone | 1.6 meters | 220 | 352 | |
Laminate flooring | 14 | 100 | 1400 | |
European chandelier | 1ç› | 600 | 600 | |
Second bedroom | ||||
Doorless wardrobe | 3.98 | 480 | 1910.4 | |
Hanging cabinet | 2.7 | 580 | 1566 | |
Wall base treatment | 28.5 | 16 | 456 | |
Wall paint | 28.5 | 12 | 342 | |
Top floor treatment | 9.7 | 16 | 155.2 | |
Top latex paint | 9.7 | 12 | 116.4 | |
Top corner line | 15.48 meters | 14 | 216.72 | |
Window stone | 1.5 m | 120 | 180 | |
Finished door and door cover | 1樘 | 980 | 980 | |
Laminate flooring | 9.5 | 100 | 950 | |
European chandelier | 1ç› | 600 | 600 | |
bathroom | ||||
Dumb mouth cover | 6.2 | 170 | 1054 | |
Bathroom ceiling | 2.12 | 170 | 360.4 | |
Wall tiles | twenty one | 110 | 2310 | |
Package water pipe | 1 | 150 | 150 | |
Aluminum buckle ceiling | 3 square meters | 120 | 360 | |
Aluminum titanium alloy door | 1 fan | 480 | 480 | |
Gate Stone | 1 item | 80 | 80 | |
Toilet | 1 set | 480 | 480 | |
Shower Umbrella | 1 set | 680 | 680 | |
Towel racks and trays | 1 set | 60 | 60 | |
Yuba | 1 set | 360 | 360 | |
Washing machine faucet | 1 | 20 | 20 | |
Aisle beam shaping | 1 | 100 | 100 | |
11 working balcony security net | 160 yuan | |||
aisle | ||||
Suspended ceiling | 10.92 | 160 | 1747.2 | |
Latex paint | 12.1 | 12 | 145.2 | |
Top floor treatment | 8.7 | 16 | 139.2 | |
Wall base treatment | 15.59 | 16 | 259.44 | |
other | ||||
Water, circuit reconstruction | item | 1 | 1, Waterway: Ming walk PPR pipe 65 yuan / meter; dark walk (brick wall) PPR pipe 75 yuan / meter (concrete wall) PPR pipe 80 yuan / meter; move PVC drain 65 yuan / meter; without faucet, valve . | |
Sanitary ware installation fee | 2, circuit; | |||
Lighting installation fee | item | 1 | 350 | (1) Ming Guan: A Strong 18/meter; B Weak (TV, telephone, network 20 yuan/meter; audio line 25 yuan/meter) |
High-altitude operation fee | item | 1 | 0 | (2) Dark pipe: On this basis, add (brick wall) 8 yuan/meter, concrete wall 12 yuan/meter. |
Rubbish clearance freight | item | 1 | 300 | Transportation from the construction site to the designated location of the residential property (one room below 80 square meters to receive 150 yuan; two-bedroom 80-120 square meters to receive 260 yuan, three-bedroom 120-150 square meters to receive 300 yuan; four-bedroom 350 yuan; villa 450 yuan). |
8% project management fee | item | 1 | 0 | Eight percent of project cost |
2% material transportation fee | item | 1 | 0 | 2% of project cost |
2% material loss fee | item | 1 | 0 | 2% of project cost |
3% remote construction | item | 1 | 0 | 3% of project cost |
3% engineering design fee | item | 1 | 0 | 3% of project cost |
Building slag removal | 240 yuan | |||
Material handling | 240 yuan |
Home decoration budget save money Raiders
1 , the design fee
The design fee ranges from a few hundred to several thousand dollars. In some places, it is also called earnest money. It means that after the owner pays the design fee, the decoration company will consider the owner really sincere to hand over the decoration project to the company. It will also invest more manpower and material resources for the owners. The design fee is not a must pay fee, as long as you can show your sincerity in other aspects, generally small and medium-sized decoration companies can be exempted from this fee.
2 , construction process
Many owners have suffered a big loss in this regard, because often companies will explain the construction materials and prices, but they will not explain the construction process. This is a common method used by many decoration companies to defraud the owners. Many decoration companies use the decoration budget table. In this respect, the lack of construction in accordance with the industry standards, to cut corners, just do surface work, once the problems have been shirked.
3 , material fee
Decoration materials costs account for the largest proportion of decoration expenditures, and are the most important factors affecting the decoration cost. The more decoration investment, the greater the proportion of decoration materials. There are various types of decoration materials on the market, and the grades and quality vary greatly. What kind of decoration materials are selected directly determines the level of decoration costs. How much of the renovation project and quantity of work is a direct factor that affects the cost of construction, such as how many cabinets to hang, what kind of top to hang, what shape to do and so on, will have an impact on the cost, generally accounting for 40% to 45% of the total project cost.
4th , the project quantity difference
This is the most common form of fraud nowadays. Many decoration companies deliberately omitted or reduced certain items when measuring the area, thus pushing down the total cost. After the owner selects it, the actual budget is calculated according to the actual area. In this case, there will be a lot more money than the decoration budget.
5 , labor costs
Including different types of labor costs, such as carpenters, bricklayers, plumbers, painters, etc., the current calculation method is generally calculated according to the construction unit price multiplied by the construction area, labor costs generally accounted for about 18% -25% of the total project cost.
6 , management fees
In the decoration process, the decoration company will take out cars, assist people in buying materials, supervise work attendance, and coordinate the costs of various aspects, accounting for 5 to 10% of the total construction cost.
Editor's summation: The home improvement budget list requires the owner to carefully prepare and implement. According to personal economic conditions and home style preferences, lifestyle habits, etc. to decorate the home, so that every corner of the home is full of sunshine. For more information on the decoration budget, please continue to pay attention to the information on this website.